Project & Start Up Related Services (This One)
It is cheaper to correct possible design errors while they
are still on the drawing board or on paper.
Changes during a
project are costly and they normally cause an extended delivery
time.
Acceptance Testing
A well documented Factory Acceptance Test and Site Acceptance
Test on Metering Systems are 2 conditions to be fullfilled in
order to make a successfull validation. The 2 acceptance tests
must be completed prior to start up of a system.
Commissioning
Commissioning of a metering system is together with the Site
Acceptance Test considered the official handover of a metering
system from the vendor to the customer, and this is often the
time for correction of the last errors in the system without
extra cost for the customer.
Validation
Validation of metering systems is a thorough check of
the main functions of the metering system, and normally all the
calculations utilized in the metering system are verified.
We have the capability to conduct the tests mentioned above
in an cost effective way. |